Milestone alert: parker can braid hair now!
Saturday, August 14, 2010
Friday, August 13, 2010
Thursday, August 12, 2010
Tile
Here's the tile floor. Bob designed the pattern (not a lot of patterns for rectangular tile) and the holes you see will be filled in. It's a slight upgrade from the sheet vinyl that was there before. Tile Guy left his levels there so we could see that everything was even.
Wednesday, August 11, 2010
Sunmer reading
All the big bookstores have a summer reading program for kids....you log x number of books, and then you can bring your log sheet in and get a free book from a preselected group. Parker started the summer really well, with independent reading nearly every day, but with all the remodel chaos, she's slacked off a bit.
At the bookstore:
She was clearly not excited by the selection, even though there were a couple decent choices. I convinced her to get a Ramona book, which she is enjoying, but she would have much preferred something from the display right next to the display of the freebies. But haha Borders, your bait and switch didn't work on me. We got our freebie book and nothing else (mainly thanks to Parker's attitude).
Don't miss the outfit: Big green glitter flip flops make from a craft kit, black rubber ankle bracelet w/ skulls from the dentist's toy bin and a blue plaid scarf tied around her waist, with the ends hanging down in the back to make a tail.
Kitchen Progress
Today they installed 2 of the 3 faucets and some of the tile. It is so strange to have running water in those rooms that I'm afraid to use the sinks. Hopefully with in the next week we'll have the disposal done and all the appliances in. That will make a HUGE difference in the quality of life around here.




